Most 3D renders take 3 to 5 business days, with a next-day service for urgent jobs. Here is what sets the timeline for renders, videos and floor plans, and how to get yours sooner.
Quick answer: Most 3D renders take 3 to 5 business days from the day we have your plans. A next-day service is available for urgent jobs. Bigger sets take longer: a package of 10 facade renders is delivered in 10 business days. Videos take about 4 days, and floor plans can be turned around the next day on request.
Typical Turnaround by Job
| Job | Typical turnaround |
|---|---|
| Exterior 3D render | 3–5 business days; next-day available |
| Interior 3D render | 3–5 business days |
| Realestate.com.au package: 1 exterior, 1 interior and 1 floor plan | 5–7 business days |
| 10 facade renders (bulk) | 10 business days |
| Walkthrough or fly-around video | About 4 days |
| 2D or coloured floor plan | Next day on request |
| Alternative colour scheme of a finished view | 24 to 48 hours |
These are the turnarounds we work to at 3D Design Studios. Prices for each job are in our 3D render cost guide.
What Happens in Those Days
- 1. Plans and quote. You send us the plans: floor plans, elevations and any colour choices you have made. We quote your job, generally within an hour during business hours.
- 2. The 3D model. We build the model from your plans.
- 3. Camera angles. We set up several clay camera angles, which are plain views of the model without colours, and you choose the ones you want.
- 4. Materials and light. Colours, materials, lighting and landscaping go in, and you see drafts along the way.
- 5. Delivery. You receive high-resolution files ready for print and smaller files for the web.
Our plain guide to what 3D rendering is explains each step in more detail.
What Makes a Render Take Longer
- More views. Every extra camera angle or room adds work.
- A bigger project. A townhouse development or a commercial building takes longer than a single home.
- Missing information. If elevations, finishes or the landscape plan are missing, we need to ask before we can model.
- Slow feedback. The job waits while camera angles and drafts are with you for approval.
- Design changes part way through. A change to the plans after modelling has started means some of the model is built again.
- Extras. Videos and 360° tours are made after the still images are approved.
How to Get Your Renders Sooner
- Send everything at once. Floor plans, elevations, the finishes schedule, the landscape plan and, for a photomontage, your site photos.
- Tell us your deadline. The quote form asks how quickly you need the work: ASAP, a 48 hour rush (+30%), standard or flexible. You can also give a deadline date.
- Approve the camera angles quickly. Rendering starts once you have chosen them.
- Give your feedback in one go. One list of changes is faster than several short ones.
- Ask about next-day service. It is available for urgent jobs.
Renders for a Council Deadline
If your renders or photomontages are going in with a development application, allow time for site photos, drafts and any changes before your lodgement date. Our guides to council photomontages and council DA submissions cover what to prepare.
Frequently Asked Questions
Can I get a 3D render in 24 hours?
Often, yes. A next-day service is available for urgent renders, and the quote form has a 48 hour rush option (+30%). Tell us your deadline when you send your plans and we will confirm what is possible.
Does a faster turnaround cost more?
The standard turnaround costs nothing extra. On the quote form, the 48 hour rush option adds 30%.
When does the clock start on a 3D render?
From the day we have your plans and you have approved the quote. Companies with an ABN pay no deposit on standard render projects, so work can start the same day.
How long do changes take once I have seen a draft?
Small changes are usually quick. An alternative colour scheme of a finished view is turned around within 24 to 48 hours.
Is a walkthrough video slower than still renders?
Not by much. Most videos are delivered in about 4 days, and most still renders in 3 to 5 business days.
Sources
- NSW Planning: your guide to the DA process, for the stages of a development application.
- Our own turnaround times, as shown on our service pages and in our 3D render cost guide.
General information only. Turnaround times depend on the project, so ask us to confirm yours when you send your plans.